top of page

Posts

Bratt Road over Canoe Creek

Updated: Apr 30, 2021


The Bratt Road bridge is currently under construction. The Balmoral Group provided assistance on the Bridge Hydraulics Report (BHR) and drainage design as well as preparation of drainage plans for Bratt Road over Canoe Creek.


0 comments

Recent Posts

See All
bottom of page