FDOT District Three SR 77
- gmiller855
- Apr 10, 2023
- 1 min read
The proof is in the pavement! Check out the before and after for this project in FDOT District Three, designed by TBG’s Roadway/Drainage crew. Improvements for this project included pedestrian pathway connectivity, milling and resurfacing, drainage upgrades, and signalization and lighting upgrades. This project is under our Safety Pillar
Comments